Dalian COSCO 57,000 ton bulk carrier (N212) trial

At 9:00 on September 24, Dalian COSCO Shipyard successfully completed the trial mission of the No. 2 57000 DWT bulk carrier N212 built by CP Company. Yan Chengxiang, deputy general manager of COSCO Shipyard Group and general manager of Dalian COSCO Shipping Co., Ltd., and the heads of relevant departments visited the terminal and greeted the test crew.

During the trial period, the ship completed more than 30 tests including overall performance, host load durability and unmanned cabin test. The test data and performance met the design requirements, and the ship owner expressed satisfaction. At present, N212 has entered the final stage of the whole ship painting and legacy projects.

Street Lighting Pole

We started to manufacture Lighting Pole from 2001 and exported from 2003. We got CE certificate for Lighting pole from 2015.

Our firm introduced whole set of good-sized numerical control hydraulic folding equipment(1280/16000) as well as equipped with a series of good-sized professional equipments of armor plate-flatted machine, lengthways cut machine, numerical control cut machine, auto-closed up machine, auto-arc-weld machine, hydraulic redressing straight machine, etc. The firm produces all sorts of conical, pyramidal, cylindrical steel poles with production range of dia 50mm-2250mm, thickness 1mm-25mm, once taking shape 16000mm long, and large-scale steel components. The firm also is equipped with a multicolor-spayed pipelining. At the meantime, for better service to the clients, our firm founded a branch com. The Yixing Jinlei Lighting Installation Com, which offers clients a succession of service from design to manufacture and fixing.

Street Lighting Pole, Lamp Pole, Powder Coated Lighting Pole

Jiangsu Xinjinlei Steel Industry Co., Ltd. , https://www.jinleisteelpole.com

This entry was posted in on