Fujian Xiamen (New) Station Area Window Elementary School Project

Project Title: Window Elementary School Project (Xin) Station Area, Xiamen City, Fujian Province (December 2011 - September 2012, RMB 0.3552 billion)
Progress phase: Engineering design and construction cycle: December 2011-September 2012 Major equipment: fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located in Jimei Xixi, Xiamen, Fujian Province, and a primary school is constructed with a total construction area of ​​11,910 square meters.
Total Investment: 0.3552 billion Yuan Construction Unit: Xiamen Special Economic Zone Real Estate Development Group Co., Ltd. Postal address: 4th Floor, No. 211, Wenta Road, Siming District, Xiamen, Fujian, China 361000
Contact: Zheng Xiaozhou Tel: 0592-2995398, 18605923558
Fax: 0592-6032698, 2995335
Design Unit: Jianmeng Engineering Design (Zhangzhou) Co., Ltd. (US-owned)
Postal address: Room 807, Riverview, Building 2, Jiangbin Road, Licheng District, Zhangzhou, Fujian Province, PRC 263000
Contact person: Mr. Zhang Tel

Related Developments: Tower Crane Infrastructure Project

Construction Hoist Steel Structure

Construction Hoist Steel Structure means the construction hoist spare parts like Construction Hoist Mast Section, Passenger Hoist Cage, Construction Hoist Wall Tie and so on.

The length of each mast section is 1508mm, the rack is fixed on the mast by three bolts and it can be exchanged. For the single cage hoist there is only one rack on the mast section, and the mast section can be used for the double cages hoist by increasing one rack. The section of the mast is diverse, select one type section according to different hoist. The mast sections are bolted together with M24 bolts and nuts to form mast. The mast is tied to the building with tie-in and is the guide rail of the cage. According to the user`s or circumstance`s request, surface of mast is hot dip galvanized, which can prevent it rusting.

The tie-in(wall tie) is the linked part between mast and building, to keep the stabilization of the mast. Distance between the tie-in is about 6~9m alone the mast. There are several types of tie-in. Select one of them according to need, tie-in can adjust the vertical of mast in definite ranges. According to the user`s or circumstance`s request, surface of the tie-in is hot dip galvanized, which can prevent it rusting.

The cage dimension(L×W×H)(m): 3×1.5×2.5. We can also manufacture cages of other size according to the user`s needs. The material of the cage and the door material can be steel wire weave, aluminum-plastic panel, punched-plate, figured aluminum board or other type according to user`s needs. The gate is equipped with drawing gate,include small turn over gate.



Construction Hoist Mast Section,Construction Elevator Mast Section,Passenger Hoist Cage,Construction Hoist Wall Tie, Construction Hoist Anchorage Frame

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sytoplesstowercrane.com

This entry was posted in on