The end of Jiangsu province to achieve a public transport card

The end of Jiangsu province to achieve a public transport card

At the 14th Asia-Pacific Intelligent Transport Forum, the Provincial Transport Department Director You Qingzhong said in an interview with reporters that the 13-city public transport card in Jiangsu will be implemented before the end of this year.

"The 'one card' is accelerating, and the biggest challenge comes from the unification of standards." You Qingzhong said that in the past every city was developing its own public transportation card. Because the standard system standards used are different, how can it be more economical? How to adjust the benefits of operators and operators is the most important issue to be solved.

Last year, with the Nanjing Youth Olympic Games convening as an opportunity, Ningzhengyang Prefecture took the lead in the implementation of public transport cards and realized regional interconnection. This has laid the foundation for the “one card” in 13 cities in the province, and it is technically ineffective. There are any problems. You Qingzhong stated that in the near future, it has reached a common framework agreement with the government departments and operating companies of each city. The plan will be accelerated after the approval of the provincial government and will be completed by the end of the year. It will be completed in 13 cities in the province. "One card."

According to reports, in addition to ordinary buses, subways, and taxis, future buses and customized bus trips can be included in the "One Card," and they will be gradually expanded to road transport, intercity railways, ETC, and other transportation areas, and eventually become " The province's transportation card will provide more convenient public transportation services.

"'Internet+Intelligent Transportation' has brought new opportunities for the transformation and upgrading of the transportation industry." According to You Qingzhong, apart from the "One Card," following last year's province and Beijing, Tianjin, Hebei, Shanxi, Shandong, Shanghai, Zhejiang After Anhui, Jiangxi, Fujian, Liaoning, Hunan, and Shaanxi have achieved the ETC networking of 14 provinces and cities, this year, 29 provinces and cities across the country will realize the interconnection of highway toll collection systems. In this way, Jiangsu’s 2.1 million ETC users can drive to most parts of the country without parking fees.

In addition, on the way of buying tickets for cars, You Qingzhong disclosed that this year, the Jiangsu Highway Passenger Transport Networking ticket upgrade project is one of the demonstration projects of the “Transportation Center of the People's Republic of China”, the “Transportation Department of the Ministry of Transport of the People's Republic of China”. It fully realizes the networking of passenger stations at Grade 2 and above in the province. Ticket sales can realize more efficient inter-station mutual sales, off-site sales, online ticket sales, mobile ticket purchases, self-service terminals, and other ticket sales methods. This will significantly increase the capacity of road passenger services and make it convenient for ordinary people to travel. At present, the system software R&D and other work has been completed, and it has been successfully trial run at Nanjing South Railway Station. The next step will be implemented in all secondary passenger stations in the province. It is expected that the province will officially launch the province's unified online ticketing service in the second half of this year.

1) Cabin: Brand new A7 series cabin, with 4-point support fully floating suspension. The height and all angle of the steering can be adjustable. Pneumatic drivers seat, central locking, electric elevating window, electric rear-view mirror.

2) Engine: D-12 series engine, turbo-charging and inter-cooling, High-pressure common rail injection, max. pressure 1600bar. Europe emission.Output:340hp-460hp. Option: D-10 series engine

3) Clutch: SINOTRUK diameter 430mm, diaphragm clutch

4) Transmission: SINOTRUK HW20716A transmission, with Smart Shift AMT

Product Name

A7 series 6*4 Tractor Truck

Dimension parameter

Length

6865mm

Width

2480mm

 

Height

3210mm

High-floor flat cab(without wind deflector)

3540mm

High-floor flat cab(with wind deflector)

3745mm

High-floor high cab(without wind deflector)

3850mm

High-floor high cab(with wind deflector)

Front/Rear overhang

1540/750,725mm(HW16 Driving axle)

Wheel base

3200+1400(HW16 Driving axle)/3225+1350mm

Wheel track

Front wheel track

2022mm

Rear wheel track

1830mm

Vehicle Configuration

Cabin

Brand new A7 series cabin, with 4-point support fully floating suspension. The height and all angle of the steering can be adjustable. Pneumatic drivers seat, central locking, electric elevating window, electric rear-view mirror.

Engine

D-12 series engine, turbo-charging and inter-cooling, High-pressure common rail injection, max. pressure 1600bar. Europe emission.Output:340hp-460hp. Option: D-10 series engine

Clutch

SINOTRUK diameter 430mm, diaphragm clutch

Transmission

SINOTRUK HW20716A transmission, with Smart Shift AMT

Front Axle

Brand new HW07 front axle, disc brake, rated loading capacity: 7000kg

Rear Axle

HW single reduction axle.OptionST16 double reduction axle

Tyre

315/80R22.5 tubeless

Brakes

Front Disc Rear Shoes Brake System,4 circuit protection valve, Engine EVB,ABS+ASR+EBL+TPM

Frame

High-strength material monolayer, : 300*90*8

Electrics

24V positive-control, CAN meter and Control System

Sinotruk Howo A7 Parts

A7 Cabin Parts,A7 D10 Engine Parts,A7 D12 Engine Parts,A7 Chassis Parts

Top Lead International Trading Co., Ltd , http://www.topleadchina.com

This entry was posted in on