The most detailed home decoration process in 2015 hastened collection

First, the entire process of decoration 21 links

1. Pre-design - 2. The main demolition - 3. Hydroelectric transformation - 4. Carpentry - 5. Tiling - 6. Brush wall paint - 7. Water heater installation - 8. Kitchen ceiling - - 9. Cabinet installation - 10. Smoke stove installation - 11. Door installation - 12. Floor installation - 13. Paving wallpaper - 14. Switch socket installation - - 15. Lighting installation - 16. Hardware Sanitary ware installation -- 17. curtain rod installation -- 18. pioneering cleaning -- 19. furniture approach -- 20. appliance installation -- 21. home accessories

(1) One of the first things that must be done in the design of the early stage design, that is, a detailed measurement of your room. The contents of the measurement mainly include:
1. Identify the area involved in the renovation process. Especially the tiling area, wall paint area, wallpaper area, floor area;
2, clear the main wall size. In particular, it is necessary to design the wall size of the furniture later. Remind everyone, do not forget to go to the property before the start of construction formalities, pay a decoration deposit.
(II) The main demolishing plan has entered the construction stage, and the main demolishing and reform is the first project to be launched. It mainly includes the demolition of walls, walls, shovels, and the replacement of plastic steel windows. When the main body is dismantled and reformed, it is to put the framework of the construction site first.
(3) Before the transformation of the hydropower reforming water circuit, the demolition of the main structure should be basically completed. Between the two stages of hydropower reform and main body demolition, the first measurement of cabinets should also be carried out. In fact, the so-called cabinet first measurement has no actual content, because the wall and the ground are not processed, the cabinet designer can not give a specific design size, but only for the developer reserved water inlet, hood socket Location, make some suggestions. mainly include:
1. Check if the position of the socket outlet affects the installation of the hood in the future;
2, see if the location of the water meter is appropriate;
3, to see if the position of the inlet is convenient for installing the sink later.
After the waterway is completed, it is best to do the waterproofing of the bathroom. The kitchen does not generally need to be waterproof. Some owners have always believed that before the renovation began, some main materials should be advanced. Xiaobian Jun must say that, unless it is the main material needed for the main demolition and reform, otherwise the entry time of main materials such as tiles and large core boards should be after the hydropower reform. Because the circuit modification involves ground slotting, if the placement of tiles or large core boards is improper, it is very troublesome for the workers to move in and out.
(4) Carpenters, bricklayers, and oil workers are the “three brothers” in the construction process. The basic order of appearance is: wood—tile—oil. The basic appearance principle is - who is dirty and who is the first. "Who is dirty? Whoever is on the first" is also one of the basic principles that determine the order of home improvement. In fact, carpentry activities such as installing standpipes, making decorative ceilings, and attaching plaster lines can be considered in a sense as a fine link in the main demolition and reform. They themselves do not conflict with the transformation of water circuits, and sometimes they still need some. Coordination, such as Xiao Bianjun mentioned earlier, “If you are preparing to make a false wall, consider whether there is a hydropower circuit on the false wall. If there is, you should let the hydropower reform workers pre-manage.”
(5) Tiling If the workers are too busy, the foreman will normally allow the bricklayer to enter the tiling when the “wooden boss” is not over. This is normal because there is no conflict between the two.
In the process of the “bricklayer”, the following two steps are also involved:
1. The installation of door stone and marble windowsill. The installation of the door stone can be done together with the paving tiles, or after the paving tiles, the installation of the marble window sill is usually done after the window cover is done. The marble worker will prepare the glass glue, and the marble and window cover are sealed with glass glue. Now.
2, the installation of floor drain. The floor drain is the first one to appear in the home improvement hardware because it must be installed together with the floor tile. Therefore, when people began to visit the building materials, they should buy a floor drain earlier.
"The bricklayer's second cousin" leaves the floor. At this time, the cabinet can be measured for the second time. Accurately speaking, after the kitchen tiles are finished, the cabinet can be measured for the second time.
(6) Brushing the wall paint “Youth Worker” enters the field, mainly to complete the basic treatment of the wall, brush the top coat, and paint the furniture used by the “wooden boss”. Owners who want to put wallpapers only need to let the “oil worker's third child” do grass-roots processing on the wallpapered wall. As to whether or not to leave the last time to finish the paint, this problem is not necessarily too true. From the experience of many owners' renovations, the significance of leaving the finish paint is not great, because the operation behind it is no more dirty than paint.
When the “boss”, “second child” and “third child” have left the court one after another, many owners will think that their decoration is almost over. In fact, if the number of links is counted, one-third will not be enough. The reason why everyone has this feeling is that people generally understand the decoration is only the decoration of the "construction part", in fact, the decoration of the "installation link" is also the focus of decoration.
If the "design link" is to "conceive" the look of our future home, then the "construction link" is to "pack" our home, really saying that the "reserve" home is almost in the "installation link."

(7) After the water heater is installed on the wall and the floor is finished, the water heater can be delivered and installed. Water heater installation is generally in the ceiling before the gas water heater has become the current trend, generally installed in the kitchen or closed balcony, if it is electric water heater, then installed in the bathroom. Intelligence Jun family is installed in the kitchen.
(8) After the kitchen ceiling heater is installed, the next step is the ceiling. Kitchen and bathroom ceiling as the installation of the head, or continue the home of "packaging." At the same time as the kitchen ceiling, the kitchen's moisture-proof ceiling lamp and exhaust fan (Yuba) should have been bought. It is generally equipped with kitchen ceiling lamps and exhaust fans (Yuba). Xiao Bian suggested that families with smaller areas should not install ceilings that are too complex, or they would make space even smaller.
(9) After the ceiling of the cabinet is installed, the cabinet door can be installed. At the same time there is a sink (can not include water and water parts) and gas stove, the best coordination of the property before the installation of the gas pass, because the gas stove installed after the need for gas.
(10) Installation of smoke stoves for smoke stoves It is advisable to install the stoves on the same day as the cabinets to facilitate coordination between the two sides.
(11) The wooden door was installed on the second day of cabinet installation. As soon as the wooden door measurement was completed more than one month ago, it can now be installed. The hinges, door locks, and suction are installed at the same time as the door is installed. The production period of solid wood doors is generally one month. Therefore, in order to make the construction period close together, the size of the door opening should be measured as soon as possible after the main demolition is completed. With regard to the handling of door openings, we need to pay attention to the fact that if the height of the door openings is inconsistent and the workers need to handle the same height, it will look better.
(twelve) floor installed in the second day of installation of wooden doors can be installed on the floor, floor installation need to pay attention to the following questions:
1, before the floor installation, it is best to allow manufacturers to come and survey whether the ground needs leveling or local leveling, and some decoration company or renovation team will suggest that everyone leveling or local leveling, to the actual survey of the floor manufacturers prevail.
2. Before the floor is installed, the floor of the home's paving floor should be cleaned, and the ground must be kept dry. However, do not use water during the cleaning process.
(13) Paving the Wallpaper The next day after the floor is installed, the home will be cleaned and the wallpaper will be pasted. If it goes well, it's the same time of day. If conditions permit, the floor should be protected on the day of paving the wallpaper; if it is not conditional, it is okay to clean up the wallpaper glue left on the floor. Before paving the wallpaper, try to "don't have anything" on the wall.
(14) The switch socket is installed in the bathroom. All sockets and switches must be waterproof. The socket must have a cover. The light switch at the entrance is recommended to use induction or fluorescent type.
There should not be too many switch sockets, and at least one socket should be left where the sockets are arranged. It should be noted that there will be more and more household appliances in general. Once there is a new appliance but no outlet, it is difficult to install it again.
(15) Lamps installed When installing lamps, if you install sub-control switches, you can save a lot of trouble. Because if there is only one master switch and several lights are on and off together, the light and darkness of the light cannot be selected, and power will be wasted, and a sub-control switch can be installed to select several lights according to needs at any time. If there is an aisle at the entrance of the house, it is best to install a switch at the end of the aisle so that the power can be turned off directly after entering the house without having to walk back to the door to turn off the lights.
(16) Before installing the hardware sanitary ware, buy a good plumbing fitting, a bathroom fitting, a toilet, a drying rack, etc., and put them on. After those “big things” were installed, the family was still “cold”. After the fixtures and hardware were installed, the family “lived” and really “lived”. It is not an exaggeration to say that the first time you opened the dragon's water and watched the flow of the water “squeaking and squeaking,” the heart would be beautiful; for the first time in a newly installed toilet, Christine would have a great sense of accomplishment. Haha~
(17) Installation of curtain rods The installation of curtain rods marks the end of home improvement. Little friends can take a break, and the days of busy dark days are finally dawning.
(18) Do not install curtains before cleaning and cleaning up. When cleaning, do not have furniture and unnecessary appliances at home. Try to keep more "flats" so that cleaning workers can thoroughly clean.
(19) Furniture Entry Time For the purchase time of furniture, the recommendation of Xiaobian is that, after the transformation of the water circuit is completed at the earliest, in this way, the basic size range of furniture is only a few in our hearts. Therefore, some students have already rushed to set the furniture before the decoration has begun. There may be problems with the size. However, the general style of the furniture can be set first.
(twenty) home appliance approach to this time, the approach of home appliances to enter the field, the installation of the installation, ready to stay!
(21) Home accessories Home accessories, the final step in home improvement, and have been transformed from decoration to decoration, including the installation of curtains are part of home accessories. As for the purchase of curtains, it is best to order furniture to avoid style conflicts. Home accessories also include considerations such as buying some green plants, wall paintings, handicrafts, etc.... In short, after staying, everyone will be free to play. Live in new home! Remind everyone that prior to arrival, first measure the formaldehyde, air treatment, ventilation, after all, the most important health!

Second, the two divisions of the decoration process

In order to facilitate everyone to further understand these 21 steps and some of the links that need attention during the period, the details are as follows:
1, for start-up procedures - 2, self-measurement - 3, pre-design - 4, the main demolition - 5, door manufacturers door measurement - 6, the first measurement of the cabinet - 7, hydropower reform - 8 , bathroom waterproofing - 9, the main material approach - 10, carpentry - 11, tiling (installation windowsill, floor drain) - 12, shower partition ruler -13, cabinet second measurement - 14, brush Wall paint -15, kitchen ceiling -16, gas -17, cabinet installation (install sink, gas stove) -18, wooden door installation -19, floor installation -20, wallpaper wallpaper - —21, switch socket installation —
-22, lighting installation - 23, hardware and sanitary fixtures - 24, curtain rod installation - 25, cleaning - 26, furniture approach - 27, appliance installation - 28, home accessories - 29, stay.

The most detailed home improvement process in 2015

(a) The four steps of the renovation process are divided into rough lines. According to the 19 links mentioned at the beginning of the article, the whole process of decoration can be roughly divided into the following four sections:
1, design links; (1)
2, construction links; (2-6)
3, the installation process; (7-16)
4, finishing links. (17-19)
(B) The six-step division of the entire renovation process According to the characteristics of the project, according to the 29 links just mentioned, the entire process of decoration can also be divided into the following six steps:
The first step: design ideas; (3)
The second step: main body demolition; (4)
Step 3: Covert Projects; (7)
Step 4: Covering the Project; (10, 11, 14, 15, 19, 20)
Step 5: Installation phase; (17, 18, 21, 22, 23, 24, 25)
The sixth step: the closing stage. (26,27,28,29)
Specific instructions:
1, design ideas, we must first have design ideas;
2. The demolition of the main body is to completely transform the rough house into a construction site. The contents of the main demolition reform mentioned above have just been said - "demolition of walls, walls, spade shovel, demolition of heating, change steel windows, etc.", And some of the woodworking;
3, hidden projects, it is equivalent to "medical surgery." Covert projects must be done first, that is, people often say "renovation begins, and hydropower first";
4, covering the project, as if to give home "clothing." Carpenter's window covers, cornices, bricklayers, brickwork, installation of window sills, oil painters - wood, tile, oil are three basic projects, behind the pinboard ceiling, paving the floor, after the wallpaper is over Even if the clothes are worn out;
5, the installation phase, mainly to complete the functional realization. Including: cabinets, wooden doors, switch sockets, lighting fixtures, hardware, sanitary ware, curtain rods... Each item has its established function;
6. In the closing stage, to put it plainly, it is to complement the factors that do not constitute "can move."

product

  1. Elevator Push Button PB2007 Multi-light, raised button with braille
  2. Elevator HOP display Y 0402 duplex
  3. 161 door lock for landing door device elevator spare part
  4. TM40M-8 door motor for XD1417 door operator
  5. CLT-10024A6 Switch Power Supplier for elevator control cabinet electrical spare parts


Specifications


  1. Stabilize and long life
  2. Multi-option for various kinds of elevators


Elevator Spare Parts

Door Spare Parts, Safety Light Curtains, Elevator Guide Rail, Elevator Guide Shoe

Ningbo Xinda Elevator Traction Technology Co., Ltd. , https://www.nbelevator.de

This entry was posted in on