· Beijing Traffic Management Bureau early warning: May 1 holiday highway opened at 7:00

The day after tomorrow is the May Day holiday. By then, Huairou, Miyun, Changping, Pinggu and other districts and counties will be the hottest destinations for citizens. The Municipal Traffic Management Bureau issued a travel notice last night, saying that from May 1st to 3rd, every day from 7:00 to 11:00 am, the expressway exits the Beijing direction, and from 3 pm to 6 pm, the traffic flow to Beijing is concentrated. .
According to the survey, the most popular area for the May Day holiday is Huairou District, accounting for 37.4%; followed by Miyun, accounting for 20.7%, which accounts for more than 50% of the total number of suburban tourism; It is 9.2% in Changping, 9.1% in Pinggu, 8.7% in Yanqing, 7.2% in Mentougou, 5.1% in Fangshan, and 2.6% in Daxing. In addition, 95% of the 36 hot spots in the city are distributed in the periphery of Jingcheng, Beijing-Tibet, Jingping, Beijing-Hong Kong-Macao Expressway; plus transit vehicles. Demand, Beijing-Tibet Expressway, Jingcheng Expressway, Jingkai Expressway, Beijing-Hong Kong-Macau Expressway, Jingping Expressway, Jingha Expressway, Airport Expressway, and some road sections of the Sixth Ring Road are expected to have congestion during the small holiday period.
The traffic control department expects that during the May 1st period, Shunyi International Flower Port, Changping Xingshou, Ming Tombs, Juyongguan, Huairou Water Great Wall, Mountain Bar, Yanqi Lake, Pinggu Dahuashan, Miyun Reservoir, and the surrounding roads of Fangshan Shidu District are expected. Many people in the car have regional congestion. Every day from 7:00 to 11:00 am, the expressway exits Beijing, and from 3 pm to 6 pm, the traffic flow to Beijing is concentrated. Therefore, it is recommended that the public travel by mistake. It is best to go to Beijing in the afternoon and go to Beijing in the morning. It is expected that the traffic volume of the expressway will increase at 6 am on May 1 and peak at 9:00 am to 11:00 am.
In order to cope with the impact of short-term and large passenger flow on road traffic, the traffic control department has especially strengthened the patrol control of the expressway. Among them, a total of 30 temporary command posts were set up along the city's expressway, and police forces were arranged to closely monitor the changes in expressway traffic to quickly make police orders.

Stepping motor is an open loop control motor, which transforms electric pulse signal into angular displacement or linear displacement. It is the main execution element of modern digital program control system, and is widely used.. In the case of non overloaded, the motor speed and stop position depends only on the pulse frequency and pulse number, regardless of load changes, when the stepper driver receives a pulse signal, it drives stepper motor to set the direction of rotation of a fixed angle, called "step", it is the rotation of the fixed point of the operation step by step. Number of pulses can be controlled by controlling the angular displacement, so as to achieve the purpose of accurate positioning; at the same time by controlling the pulse frequency to control the motor rotation speed and acceleration, so as to achieve the purpose of speed.

Stepper Motor Stack

Stepper Motor Stack,Treadmill Motor Core,Treadmill Motor Stack,Electric Car Motor Stack

YUYAO YUANZHONG MOTOR PUNCHING CO.,LTD. , http://www.yuyaoyuanzhong.com

This entry was posted in on